Commit graph

66 commits

Author SHA1 Message Date
Liran BN d25ed108f7 fixing version before publishing 2014-10-01 16:38:57 +03:00
liranbg b16fc2b792 fix before first release
fixed english translation,
changed connectivity checkings
add more debugging functions
2014-09-27 01:40:02 +03:00
liranbg 0f6ffb1223 fix #19
finally i found it! now the status bar size changes automatically
2014-09-23 07:12:45 +03:00
liranbg 659db87884 changed translations
added more detailes, help, translations and label with link in mainscreen ui
2014-09-23 05:57:35 +03:00
liranbg e6e7557a31 fix #17
default room\lecturer strings
also fixed an huge bug i found! (couldnt export calendar if there were courses over 17 pm!)
i also used trimming function to avoid empty spaces in data
2014-09-23 04:15:38 +03:00
liranbg 845bfbdafb include bug in prev commit 2014-09-23 01:26:37 +03:00
liranbg da009ed027 fix #16
more debugging detailes from mainscreen.cpp
add version variable to .pro
changed location of jcelogger
~still need to add translations
2014-09-23 01:17:05 +03:00
Sagi Dayan 835ab042ea Fixing Compiler errors from lirans merge 2014-09-22 18:39:16 +03:00
liranbg 256b9085a9 added relogin, reconnection, changed pointer allocation 2014-09-22 05:04:38 +03:00
liranbg e029f9c615 add network checking. now we can handle network link errors 2014-09-18 03:34:49 +03:00
liranbg 090dc28137 icon fix 2014-09-18 01:59:42 +03:00
Sagi Dayan 6979de6576 Merge conflict - fixed 2014-09-17 19:56:26 +03:00
Sagi Dayan d2b7cf40c8 Documentation 2014-09-17 19:52:21 +03:00
Sagi Dayan db8d399235 If running in Debug mode - messages to terminal, else to Log file 2014-09-17 16:14:05 +03:00
Liran BN 91baf6f1c2 fix 2014-09-17 15:37:18 +03:00
liranbg f7a468fb31 csv exporting messages fix. 2014-09-17 05:55:28 +03:00
liranbg c3345399f4 fixed the null pointer error on csv exportion 2014-09-17 05:47:12 +03:00
liranbg 13eef8a2ed fix dates validation. remove debugging in page 2014-09-17 04:57:44 +03:00
liranbg 03a75ab737 QString instead of std::string. added socket error handle, still not completed the handling 2014-09-17 04:08:38 +03:00
Sagi Dayan a6a923e31b Added a Log Parser & Atempt to fix #12
Added a class that pars all qDebug Messages to a log file.
Atempt to fix #12, on linux it works.
2014-09-17 00:08:29 +03:00
Sagi Dayan 582a959fb3 Testing the Bug #10 2014-09-14 15:01:27 +03:00
Sagi Dayan 99aa0ed909 Fix #10
Added a bool flag to main.
calendarLoaded.

@liranbg - you method did not work (at least on linux)...

now user will be prompted with an error message dialog. No Crash.

Closing bug #10
2014-09-12 12:11:28 +03:00
liranbg 8a5f99279c fix null ptr on exportCalendarCSV 2014-09-12 11:43:55 +03:00
Liran BN e67505b9ee some pointers checking, still bugged 2014-09-11 23:08:37 +03:00
Liran BN 375b72feac add icon the date dialog. dates changed by default. translate update. still bugged 2014-09-11 22:58:08 +03:00
Liran BN 078f885909 calendar dialog function are inside calendarmanager 2014-09-11 15:48:23 +03:00
Sagi Dayan a684e59628 Merge conflict fix 2014-09-11 15:27:00 +03:00
liranbg 834ee3469e translation fixes 2014-09-11 06:24:52 +03:00
Sagi Dayan 5c92a3f112 Export to CSV with Semester begin & end
all bugs that i found fixed.
now when user selects "export to csv" he will be prompt
to input the begining and the end of the semester.

the csv file will populate the whole semester!
just one click and you are done.

@liranbg (Liran) please check on Windows and OSX.
linux is rocking!

let me know if you need anything else.
sagi
2014-09-09 23:31:48 +03:00
Sagi Dayan eb5de02be2 Fixes to the Calendar Dialog. QA 2014-09-09 21:24:53 +03:00
Sagi Dayan bc7d61fa38 Undeg HARD dev - calendar dialog for helping CSV exporter 2014-09-09 14:40:11 +03:00
Liran BN fc477a3239 error icon on empty string input 2014-09-09 11:20:58 +03:00
Sagi Dayan d73dc6bb9e Local changes according to users settings + CSV extention file is fixed 2014-09-08 20:07:42 +03:00
Liran Ben gida 235354210b Added CSV on linux, mac, windows 2014-09-08 18:54:52 +03:00
Liran BN 4fa27283d9 Revert "CVS OPTION ADDED, minor improvments"
This reverts commit cd43b26d50.
2014-09-08 17:30:18 +03:00
Liran BN cd43b26d50 CVS OPTION ADDED, minor improvments 2014-09-08 17:29:49 +03:00
Sagi Dayan af10a074c0 User Dialog Message to the export resaults 2014-09-07 23:14:04 +03:00
Sagi Dayan 11b4101c58 Added Featcher: Export calendar to CSV format for
GoogleCalendar/iCal/Outlook

at the gui - calendar tab - there is now an export to csv button.
clicking it will prompt thr user to save the file on his system hard
drive. the app will add the .csv extention.

the csv file, will export only one week, starting from the begining of
the first semester of 2015 (the one that is coming).

in the future i will add a Held doc for exporting and importimg to the
users calendar.

cheers!
2014-09-07 22:57:01 +03:00
Liran BN 5563677671 schedule is almost done! 2014-09-02 01:19:24 +03:00
Sagi Dayan cf49325e3b Tested and works! (SaveData)
Now all the data is saved as a binary file.
Note: the SaveData class is now an object!

works as it should!
2014-09-01 00:27:15 +03:00
Liran BN 65ce3d40ea bugs 2014-08-31 12:35:43 +03:00
Liran BN 95ccaa39d0 Add calendar option
bug fixes, better phrasing, calendar option
2014-08-31 12:33:27 +03:00
Liran BG 1a3813d858 Merge branch 'master' of https://github.com/liranbg/jceAverageCalculator 2014-08-27 13:49:22 +03:00
Liran BG b39a5a434a a 2014-08-27 13:49:15 +03:00
liranbg 6769a160a6 Merge pull request #4 from sagidayan/master
Translation - En/He
2014-08-27 13:05:53 +03:00
liranbg 4f54ad85a7 connection fix 2014-07-11 17:01:25 +03:00
Sagi Dayan 0bb2835865 Merge branch 'tr'
conflicts fixed - only in the credits...

Conflicts:
	main/mainscreen.cpp
2014-06-28 07:19:58 +03:00
Sagi Dayan ca2b2d3cca Translation!
most of the ui is translated English & Hebrew,
the Lang will be as the user's OS.

qm files need to be in the debuging directory for this to work.
2014-06-28 07:15:19 +03:00
Sagi Dayan a25c220532 Translate Works - Table and how-to still not working 2014-06-28 06:36:10 +03:00
Sagi Dayan 9d46e9ecf6 Translated tr files 2014-06-28 01:22:44 +03:00