Commit graph

66 commits

Author SHA1 Message Date
2a4b245234 Added some more documentation
DocBlocks to all major functions.
hope it helps...
2014-09-26 23:00:40 +03:00
liranbg
659db87884 changed translations
added more detailes, help, translations and label with link in mainscreen ui
2014-09-23 05:57:35 +03:00
liranbg
e6e7557a31 fix #17
default room\lecturer strings
also fixed an huge bug i found! (couldnt export calendar if there were courses over 17 pm!)
i also used trimming function to avoid empty spaces in data
2014-09-23 04:15:38 +03:00
liranbg
da009ed027 fix #16
more debugging detailes from mainscreen.cpp
add version variable to .pro
changed location of jcelogger
~still need to add translations
2014-09-23 01:17:05 +03:00
623baafce3 Added a new algorithm to fix #15
Added a few if statmenst to fix that issue.

in addition , added a privat function to convert the returnd dayOfWeek
(QDate returns sunday=7 monday=2...) to JCE Manager format (AKA:
sunday=1, monday=2 ....).

checked on linux. working great!

Issue #15.
2014-09-22 21:54:38 +03:00
2c4ae54ffc Changed File Name For The Saved Data 2014-09-22 21:54:16 +03:00
835ab042ea Fixing Compiler errors from lirans merge 2014-09-22 18:39:16 +03:00
liranbg
256b9085a9 added relogin, reconnection, changed pointer allocation 2014-09-22 05:04:38 +03:00
liranbg
68bd693dd8 reconnecting fix 2014-09-22 00:53:28 +03:00
liranbg
b4559f5182 compiling error fix 2014-09-21 14:08:22 +03:00
liranbg
ce4947fe5a Merge branch 'master' of https://github.com/liranbg/JceManager 2014-09-21 13:31:44 +03:00
liranbg
32e4272f83 server disconnection bug 1 2014-09-21 13:31:26 +03:00
bf0c2574de Cleaning after merge 2014-09-18 15:27:48 +03:00
06ebed20d3 Merge branch 'master' of https://github.com/liranbg/JceManager 2014-09-18 15:25:56 +03:00
4af9675bad Merge branch 'sagi_dev' fix #14 2014-09-18 15:24:27 +03:00
8fa723a162 Added UTF-8 codec to csv file. fix #14 2014-09-18 15:24:05 +03:00
liranbg
ac0973cf11 reconnected is working! just need to add the validations steps and we are good to go 2014-09-18 06:18:49 +03:00
liranbg
9be57bfecf attemp to fix the reconnecting issue. 2014-09-18 05:18:33 +03:00
liranbg
e029f9c615 add network checking. now we can handle network link errors 2014-09-18 03:34:49 +03:00
liranbg
090dc28137 icon fix 2014-09-18 01:59:42 +03:00
Liran BN
b092ca5ec2 fixed qstring casting 2014-09-17 20:06:36 +03:00
6979de6576 Merge conflict - fixed 2014-09-17 19:56:26 +03:00
d2b7cf40c8 Documentation 2014-09-17 19:52:21 +03:00
Liran BN
91baf6f1c2 fix 2014-09-17 15:37:18 +03:00
liranbg
f7a468fb31 csv exporting messages fix. 2014-09-17 05:55:28 +03:00
liranbg
c3345399f4 fixed the null pointer error on csv exportion 2014-09-17 05:47:12 +03:00
liranbg
13eef8a2ed fix dates validation. remove debugging in page 2014-09-17 04:57:44 +03:00
liranbg
03a75ab737 QString instead of std::string. added socket error handle, still not completed the handling 2014-09-17 04:08:38 +03:00
a6a923e31b Added a Log Parser & Atempt to fix #12
Added a class that pars all qDebug Messages to a log file.
Atempt to fix #12, on linux it works.
2014-09-17 00:08:29 +03:00
liranbg
8a5f99279c fix null ptr on exportCalendarCSV 2014-09-12 11:43:55 +03:00
Liran BN
e67505b9ee some pointers checking, still bugged 2014-09-11 23:08:37 +03:00
Liran BN
375b72feac add icon the date dialog. dates changed by default. translate update. still bugged 2014-09-11 22:58:08 +03:00
Liran BN
078f885909 calendar dialog function are inside calendarmanager 2014-09-11 15:48:23 +03:00
a684e59628 Merge conflict fix 2014-09-11 15:27:00 +03:00
liranbg
834ee3469e translation fixes 2014-09-11 06:24:52 +03:00
5c92a3f112 Export to CSV with Semester begin & end
all bugs that i found fixed.
now when user selects "export to csv" he will be prompt
to input the begining and the end of the semester.

the csv file will populate the whole semester!
just one click and you are done.

@liranbg (Liran) please check on Windows and OSX.
linux is rocking!

let me know if you need anything else.
sagi
2014-09-09 23:31:48 +03:00
eb5de02be2 Fixes to the Calendar Dialog. QA 2014-09-09 21:24:53 +03:00
bc7d61fa38 Undeg HARD dev - calendar dialog for helping CSV exporter 2014-09-09 14:40:11 +03:00
df791d62b4 Need testing on mac and Windows 2014-09-08 20:59:02 +03:00
431b71bebc Fixed the CSV bug 2014-09-08 20:52:38 +03:00
d73dc6bb9e Local changes according to users settings + CSV extention file is fixed 2014-09-08 20:07:42 +03:00
Liran Ben gida
235354210b Added CSV on linux, mac, windows 2014-09-08 18:54:52 +03:00
Liran BN
4fa27283d9 Revert "CVS OPTION ADDED, minor improvments"
This reverts commit cd43b26d50.
2014-09-08 17:30:18 +03:00
Liran BN
cd43b26d50 CVS OPTION ADDED, minor improvments 2014-09-08 17:29:49 +03:00
f63ac39fdc Added Encription Lib From Qt-Project And Modified the shit out of it.
Now the password should be encrypted.

See that encrypt and decrypt key is the same key!

cheers!
2014-09-07 23:44:27 +03:00
11b4101c58 Added Featcher: Export calendar to CSV format for
GoogleCalendar/iCal/Outlook

at the gui - calendar tab - there is now an export to csv button.
clicking it will prompt thr user to save the file on his system hard
drive. the app will add the .csv extention.

the csv file, will export only one week, starting from the begining of
the first semester of 2015 (the one that is coming).

in the future i will add a Held doc for exporting and importimg to the
users calendar.

cheers!
2014-09-07 22:57:01 +03:00
Liran BN
5563677671 schedule is almost done! 2014-09-02 01:19:24 +03:00
cf49325e3b Tested and works! (SaveData)
Now all the data is saved as a binary file.
Note: the SaveData class is now an object!

works as it should!
2014-09-01 00:27:15 +03:00
1a3747956a New way of saving data
not yet checked due to compiling errors coming from Liran's changes in
Page.h

pls, let me know if you fixed it. so i can run some tests!
2014-08-31 21:39:43 +03:00
8172f695d1 Merge fix 2014-08-31 20:54:33 +03:00